T

Senior Project Engineer - Electrical Focus for Data Centre Construction

TGS International Group

Frankfurt, Hessen, Germany · Full Time

Be the first to apply

Experience
Any
Salary
EUR 60,000 – EUR 80,000 / year
Openings
1
Posted
il y a 2 semaines
Work mode
In office
Education
Engineering degree or related qualification
Resume
Required to apply

Where you'll work

Job description

About the Role

We are partnered with a prominent mechanical and electrical (M&E) design and build firm known for managing large, intricate projects across Europe and the UK, especially in critical mission and data centre sectors. With growth accelerating in Germany, a skilled Senior Project Engineer is sought to support a key data centre project based in Frankfurt. This permanent full-time position offers a competitive salary between €60,000 and €80,000 alongside a living allowance, accommodation, and flights for a rotation schedule of 17 days on and 4 days off.

Key Responsibilities

  • Evaluating project designs, specifications, and precise technical requirements.
  • Overseeing technical submittals through complete review and approval stages.
  • Generating and managing Requests for Information (RFIs), maintaining accurate logs.
  • Collaborating closely with Project Managers, Design Teams, and Quantity Surveyors to monitor project milestones.
  • Ensuring site teams utilize the latest approved drawings and specifications.
  • Managing redline drawings and aligning as-built documentation with the design team.
  • Monitoring delivery timelines for long-lead equipment critical to the construction schedule.
  • Overseeing subcontractor performance and ensuring compliance with project standards.
  • Participating in site visits and project coordination meetings to streamline communication.
  • Assisting the commercial team with variation handling, change management, and procurement processes.
  • Maintaining adherence to all relevant building codes, technical standards, and environmental health and safety regulations.
  • Supporting commissioning activities, project handover, and creation of operations and maintenance (O&M) documentation.
  • Keeping meticulous project and document control records throughout the project lifecycle.

Candidate Profile

  • Demonstrated experience as a Project Engineer or Senior Project Engineer in mechanical and electrical construction projects.
  • Proven track record on large-scale and technically demanding projects, with preference for experience in data centre or mission-critical environments.
  • Strong expertise in M&E systems and construction execution.
  • Technical proficiency handling submittals, RFIs, drawings, and various project documentation.
  • Excellent coordination skills to bridge design, commercial, and site teams effectively.
  • Educational background in Engineering or related technical disciplines.
  • Proficient in MS Project and Microsoft Office; AutoCAD knowledge is an advantage.

Work styles they’re looking for

Stakeholder Communication

Leave it if you'd like a reply — we won't use it for anything else.

Click to browse, drag & drop, or paste a screenshot

PNG, JPG, GIF, MP4, WebM, MOV · Max 20MB each · Up to 5 files

🤖
Online · instant AI help